How many years has the hype been responsible. Job description of the chief engineer of the project. I. General provisions

  • 19.11.2019

The job description of the chief engineer of the project contains a very wide range of responsibilities. This is not surprising, because this person maintains it, supervising any nuances related to it.

What is the peculiarity of working as a chief project engineer (CIP)

Chief Engineer project is responsible person for the respective project. His competence includes all aspects of its implementation, including the development, direct execution and subsequent use of the object resulting from the work.

An essential feature of the work of a chief engineer is high degree of responsibility. He is responsible for the success of the project, the accuracy of its implementation, and all the parameters that are significant for its functioning. Of course, the reverse side of this is a very high remuneration for work.

General provisions of the instruction

General provisions instructions of the chief project engineer - this is its key part, including the main points related to this position. Among the rules included in this section are the following:

Responsibilities and tasks

The duties of the chief project engineer include solving a wide range of tasks related to the development of the corresponding project. In particular, he must:

Requirements for a specialist

Requirements for an employee holding the position of chief project engineer may vary in instructions different companies. It is usually established that the applicant for this position must:

  • have a diploma of higher professional education;
  • have a certain work experience in the specialty, for example, three years.

Also, an additional requirement may be included in the instruction, according to which the employee must undergo special training in the direction of his activity, to which this enterprise belongs.

Responsibility and rights

The chief project engineer is a very important position. Therefore, he is liable for improper actions, since the damage as a result of them can be very large. In particular, adverse consequences for such an employee may occur:

Since the role of the chief engineer of the project is very large, he is granted broad rights within his competence. In particular, this employee may:

  • request information and documents that he needs to perform his functions;
  • interact with other organizations and their structural divisions to negotiate on issues within the competence of this employee.

Your attention is a video of how the chief project engineer works in order to better understand the range of responsibilities that a person in this position faces.

APPROVE:

________________________

[Job title]

________________________

________________________

[Name of company]

________________/[FULL NAME.]/

"____" ____________ 20__

JOB DESCRIPTION

Chief Project Engineer

  1. General provisions

1.1. This job description defines and regulates the powers, functional and job duties, rights and responsibilities of the chief engineer of the project [Name of organization in the genitive case] (hereinafter referred to as the Company).

1.2. The chief engineer of the project belongs to the category of managers, is appointed to the position and dismissed from the position in the established current labor law by order of the head of the Company.

1.3. The Chief Project Engineer reports directly to the head of the Company.

1.4. A person with a higher professional education and work experience in design or scientific and pedagogical work in the relevant field of knowledge for at least 8 years, and when designing especially large and complex objects - at least 10 years.

1.5. The Chief Project Engineer must know:

  • prospects for the development of the relevant sector of the economy, science and technology;
  • design methods;
  • organization, planning and economics of design and engineering surveys;
  • advanced domestic and overseas experience design and construction;
  • basics of standardization, certification and patent science;
  • resolutions, orders, orders of higher authorities, guidance, methodological and regulatory materials for the design, construction and operation of facilities;
  • technical, economic, environmental and social demands presented to the designed objects;
  • requirements for the organization of labor in the design of objects for various purposes;
  • building regulations;
  • modern technical means design and implementation of computational work;
  • standards, specifications and other guidance materials for the development and execution of design estimates and other technical documentation;
  • the procedure for concluding and executing contracts for the creation (transfer) of scientific and technical products; economics and organization of construction;
  • Copyright;
  • automation tools design work;
  • labor protection rules and regulations.

1.6. The chief project engineer in his activities is guided by:

  • company charter;
  • this job description;
  • regulatory materials for the design, construction and operation of facilities.

1.7. During the period of temporary absence of the chief engineer of the project, his duties are assigned to [name of the position of the deputy], who is appointed in accordance with the established procedure, acquires the relevant rights and is responsible for failure to perform or improper performance of the duties assigned to him in connection with the replacement.

2. Job responsibilities

The chief project engineer is required to perform the following labor functions:

2.1. Carries out technical management of design and survey work in the design of an object and field supervision of its construction, commissioning and development of design capacities.

2.2. Based on the use of the latest achievements of science and technology, the most appropriate and economical design solutions provide a high technical and economic level of the designed facilities.

2.3. Takes measures aimed at improving the quality of design estimates and reducing costs material resources during the construction of facilities, reducing the cost of their operation based on improving the quality of design, urban planning and architectural and planning solutions.

2.4. Prepares data for the conclusion of contracts with customers for the development (transfer) of scientific and technical products, including the justification of contract prices.

2.5. Participates in the work of commissions for the selection of sites (routes) for construction, in the preparation of design assignments and in the organization of engineering surveys for the development of design estimates and other technical documentation.

2.6. Organizes its development for the objects assigned to it, participates in the preparation of comprehensive schedules for the implementation of research, design, engineering and technological works for facilities that will use new technological processes and equipment with a long cycle of development, design and manufacture.

2.7. Draws up calendar plans for the release of scientific and technical products.

2.8. Develops proposals on the composition of the project developers, distributes tasks between them by sections and parts of the project, the volume and cost of work.

2.9. Forms tasks for subcontractors to perform the work assigned to them and provides these organizations with the necessary initial data.

2.10. Resolves issues that arise during the documentation development process.

2.11. Carries out control over the technical level of accepted design, urban planning and architectural and planning decisions, economical spending of funds for design and survey work, the timing of the development of design and estimate documentation.

2.12. Ensures compliance with the developed design and estimate documentation state standards, rules, regulations and guidelines.

2.13. Provides a check for patent purity and patentability for the first time applied in the project or developed for it technological processes, equipment, instruments, structures, materials and products.

2.14. He defends the project in higher organizations and examination bodies.

2.15. Participates in the review and approval of the general contract construction organization design and estimate documentation.

2.16. Resolves issues that arise in the process of construction design, commissioning of the facility, development of design capacities.

2.17. Organizes work to eliminate the detected defects in design estimates and other technical documentation, as well as to account for the expenditure of approved estimates.

2.18. Prepares proposals to the management of the design organization and the customer on making changes to the working documentation related to the introduction of new normative documents, taking into account the actual state of construction.

2.19. Coordinates reasonable deviations from existing norms, rules, instructions with state supervision bodies and other organizations that have approved them.

2.20. Provides analysis and generalization of experience in design, construction and operation of constructed facilities and preparation on this basis of proposals to improve the technical and economic level of design solutions.

2.21. Prepares reviews and conclusions for rationalization proposals and inventions, draft standards, specifications and other regulatory documents related to design and construction.

2.22. He takes part in the examination of projects, the preparation of publications and the preparation of applications for inventions, in the work of seminars and conferences in his specialty.

In case of official necessity, the chief engineer of the project may be involved in the implementation of his official duties overtime, in the manner prescribed by law.

3. Rights

The chief project engineer has the right to:

3.1. Participate in the discussion of draft decisions of the head of the company.

3.2. Dispose of those entrusted to him financial resources and property in compliance with the requirements defined by legislative and regulatory legal acts, the charter of the organization.

3.3. Sign and endorse documents within their competence.

3.4. Initiate and hold meetings on organizational, financial and economic issues.

3.6. Conduct quality and timeliness checks on assignments.

3.7. Demand the termination (suspension) of work (in case of violations, non-compliance with established requirements), compliance with established norms, rules, instructions, give instructions on correcting deficiencies and eliminating violations.

3.8. Submit to the head of the company ideas on the admission, transfer and dismissal of employees, on the promotion of distinguished employees and on the application disciplinary action to workers who violate labor discipline.

3.9. Participate in the discussion of issues related to their official duties.

3.10. Require the head of the company to assist in the performance of their duties and rights.

4. Responsibility and performance evaluation

4.1. The chief engineer of the project bears administrative, disciplinary and material (and in some cases, provided the legislation of the Russian Federation, and criminal liability for:

4.1.1. Non-fulfillment or improper fulfillment of official instructions of the immediate supervisor.

4.1.2. Failure or improper performance of labor functions and the tasks assigned to him.

4.1.3. Unlawful use of the granted official powers, as well as their use for personal purposes.

4.1.4. Inaccurate information about the status of the work entrusted to him.

4.1.5. Failure to take measures to suppress the identified violations of safety regulations, fire and other rules that pose a threat to the activities of the enterprise and its employees.

4.1.6. Failure to enforce labor discipline.

4.2. Evaluation of the work of the chief engineer of the project is carried out:

4.2.1. Direct supervisor - regularly, in the course of the daily implementation by the employee of his labor functions.

4.2.2. Certification Commission enterprises - periodically, but at least once every two years, based on the documented results of work for the evaluation period.

4.3. The main criterion for evaluating the work of the chief engineer of the project is the quality, completeness and timeliness of his performance of the tasks provided for by this job description.

5. Working conditions

5.1. The mode of operation of the chief engineer of the project is determined in accordance with the rules of the internal work schedule established by the Company.

5.2. In connection with production necessity the chief engineer of the project is obliged to go on business trips (including local ones).

5.3. To resolve operational issues to ensure production activities the chief engineer of the project may be allocated company vehicles.

6. Right to sign

6.1. To ensure his activities, the chief engineer of the project is given the right to sign organizational and administrative documents on issues referred to his competence by this job description.

Familiarized with the instructions ____ / ____________ / "__" _______ 20__

APPROVE:

________________________

[Job title]

________________________

________________________

[Name of company]

________________/[FULL NAME.]/

"____" ____________ 20__

JOB DESCRIPTION

Chief Project Engineer

  1. General provisions

1.1. This job description defines and regulates the powers, functional and job duties, rights and responsibilities of the chief engineer of the project [Name of organization in the genitive case] (hereinafter referred to as the Company).

1.2. The chief engineer of the project belongs to the category of managers, is appointed to the position and dismissed in accordance with the procedure established by the current labor legislation by order of the head of the Company.

1.3. The Chief Project Engineer reports directly to the head of the Company.

1.4. A person who has a higher professional education and at least 8 years of experience in design or scientific and pedagogical work in the relevant field of knowledge, and at least 10 years in the design of especially large and complex objects, is appointed to the position of chief engineer of the project.

1.5. The Chief Project Engineer must know:

  • prospects for the development of the relevant sector of the economy, science and technology;
  • design methods;
  • organization, planning and economics of design and engineering surveys;
  • advanced domestic and foreign experience in design and construction;
  • basics of standardization, certification and patent science;
  • resolutions, orders, orders of higher authorities, guidance, methodological and regulatory materials for the design, construction and operation of facilities;
  • technical, economic, environmental and social requirements for the designed facilities;
  • requirements for the organization of labor in the design of objects for various purposes;
  • building regulations;
  • modern technical means of designing and performing computational work;
  • standards, specifications and other guidance materials for the development and execution of design estimates and other technical documentation;
  • the procedure for concluding and executing contracts for the creation (transfer) of scientific and technical products; economics and organization of construction;
  • Copyright;
  • means of automation of design work;
  • labor protection rules and regulations.

1.6. The chief project engineer in his activities is guided by:

  • company charter;
  • this job description;
  • regulatory materials for the design, construction and operation of facilities.

1.7. During the period of temporary absence of the chief engineer of the project, his duties are assigned to [name of the position of the deputy], who is appointed in accordance with the established procedure, acquires the relevant rights and is responsible for failure to perform or improper performance of the duties assigned to him in connection with the replacement.

2. Job responsibilities

The chief project engineer is required to perform the following labor functions:

2.1. Carries out technical management of design and survey work in the design of an object and field supervision of its construction, commissioning and development of design capacities.

2.2. Based on the use of the latest achievements of science and technology, the most appropriate and economical design solutions provide a high technical and economic level of the designed facilities.

2.3. Takes measures aimed at improving the quality of design and estimate documentation and reducing the consumption of material resources during the construction of facilities, reducing the cost of their operation based on improving the quality of design, urban planning and architectural and planning solutions.

2.4. Prepares data for the conclusion of contracts with customers for the development (transfer) of scientific and technical products, including the justification of contract prices.

2.5. Participates in the work of commissions for the selection of sites (routes) for construction, in the preparation of design assignments and in the organization of engineering surveys for the development of design estimates and other technical documentation.

2.6. He organizes its development at the facilities assigned to him, participates in the preparation of comprehensive schedules for the implementation of research, design, engineering and technological work for facilities that will use new technological processes and equipment with a long development, design and manufacturing cycle.

2.7. Draws up calendar plans for the release of scientific and technical products.

2.8. Develops proposals on the composition of the project developers, distributes tasks between them by sections and parts of the project, the volume and cost of work.

2.9. Forms tasks for subcontractors to perform the work assigned to them and provides these organizations with the necessary initial data.

2.10. Resolves issues that arise during the documentation development process.

2.11. Carries out control over the technical level of accepted design, urban planning and architectural and planning decisions, economical spending of funds for design and survey work, the timing of the development of design and estimate documentation.

2.12. Guarantees compliance of the developed design and estimate documentation with state standards, norms, rules and instructions.

2.13. Provides verification for patent purity and patentability of technological processes, equipment, devices, structures, materials and products first applied in the project or developed for it.

2.14. He defends the project in higher organizations and examination bodies.

2.15. Participates in the review and approval of design estimates by the general contracting construction organization.

2.16. Resolves issues that arise in the process of construction design, commissioning of the facility, development of design capacities.

2.17. Organizes work to eliminate the detected defects in design estimates and other technical documentation, as well as to account for the expenditure of approved estimates.

2.18. Prepares proposals to the management of the design organization and the customer on making changes to the working documentation related to the introduction of new regulatory documents, taking into account the actual state of construction.

2.19. Coordinates reasonable deviations from existing norms, rules, instructions with state supervision bodies and other organizations that have approved them.

2.20. Provides analysis and generalization of experience in design, construction and operation of constructed facilities and preparation on this basis of proposals to improve the technical and economic level of design solutions.

2.21. Prepares reviews and opinions on rationalization proposals and inventions, draft standards, specifications and other regulatory documents related to design and construction.

2.22. He takes part in the examination of projects, the preparation of publications and the preparation of applications for inventions, in the work of seminars and conferences in his specialty.

In case of official necessity, the chief engineer of the project may be involved in the performance of his official duties overtime, in the manner prescribed by law.

3. Rights

The chief project engineer has the right to:

3.1. Participate in the discussion of draft decisions of the head of the company.

3.2. Dispose of the financial resources and property entrusted to him in compliance with the requirements determined by legislative and regulatory legal acts, the charter of the organization.

3.3. Sign and endorse documents within their competence.

3.4. Initiate and hold meetings on organizational, financial and economic issues.

3.6. Conduct quality and timeliness checks on assignments.

3.7. Demand the termination (suspension) of work (in case of violations, non-compliance with established requirements), compliance with established norms, rules, instructions, give instructions on correcting deficiencies and eliminating violations.

3.8. Submit to the head of the company ideas on the admission, transfer and dismissal of employees, on the promotion of distinguished employees and on the application of disciplinary sanctions to employees who violate labor discipline.

3.9. Participate in the discussion of issues related to their official duties.

3.10. Require the head of the company to assist in the performance of their duties and rights.

4. Responsibility and performance evaluation

4.1. The chief engineer of the project bears administrative, disciplinary and financial (and in some cases, provided for by the legislation of the Russian Federation, criminal) responsibility for:

4.1.1. Non-fulfillment or improper fulfillment of official instructions of the immediate supervisor.

4.1.2. Failure to perform or improper performance of their labor functions and assigned tasks.

4.1.3. Unlawful use of the granted official powers, as well as their use for personal purposes.

4.1.4. Inaccurate information about the status of the work entrusted to him.

4.1.5. Failure to take measures to suppress the identified violations of safety regulations, fire and other rules that pose a threat to the activities of the enterprise and its employees.

4.1.6. Failure to enforce labor discipline.

4.2. Evaluation of the work of the chief engineer of the project is carried out:

4.2.1. Direct supervisor - regularly, in the course of the daily implementation by the employee of his labor functions.

4.2.2. Attestation Commission of the enterprise - periodically, but at least once every two years based on the documented results of the work for the evaluation period.

4.3. The main criterion for evaluating the work of the chief engineer of the project is the quality, completeness and timeliness of his performance of the tasks provided for by this job description.

5. Working conditions

5.1. The work schedule of the chief engineer of the project is determined in accordance with the internal labor regulations established by the Company.

5.2. In connection with the production need, the chief engineer of the project is obliged to go on business trips (including local ones).

5.3. To resolve operational issues related to the provision of production activities, the chief engineer of the project may be allocated company vehicles.

6. Right to sign

6.1. To ensure his activities, the chief engineer of the project is given the right to sign organizational and administrative documents on issues referred to his competence by this job description.

Familiarized with the instructions ____ / ____________ / "__" _______ 20__

02/11/2012

Ministry regional development The Russian Federation prepared in August 2012 the following CONCLUSION on the assessment of the regulatory impact on the draft federal law "On Amendments to the Town Planning Code Russian Federation" and the federal law"On architectural activity in the Russian Federation" in terms of the mandatory participation of the GUI and the PGA in the design process. The Ministry of Economic Development of Russia, in accordance with paragraph 60(1) of the Regulations of the Government of the Russian Federation, approved by Decree of the Government of the Russian Federation No. 260 dated June 1, 2004, considered the draft federal law “On Amendments to the Town Planning Code of the Russian Federation and the Federal Law “On Architectural Activities in of the Russian Federation” (hereinafter referred to as the draft law) and, based on the results of the regulatory impact assessment procedure, reports the following. According to the explanatory note to the draft law, it is aimed at fixing the mandatory participation of the chief engineer of the project and the chief architect of the project (hereinafter, respectively - CIP, CAP) in the design process, which should "lead to an increase in the quality and safety of the prepared project documentation”, “create additional conditions for the implementation of safe and high-quality projects”, since it is the GIP (GAP) “should provide high-quality design that meets the requirements of regulatory and technical documents that ensure the safety of facilities capital construction, as well as bear personal, including administrative and criminal, responsibility for the prepared project documentation.

none"> The draft law provides that the GIP (GAP), certified in the manner and according to the criteria to be established later by the federal executive body in the field of construction, is appointed during the design of the facility and is responsible for the compliance of the design documentation being developed with the developer's design task, the results of engineering surveys, town planning land plot, requirements of technical regulations and other documents.

none"> The presence at the main place of work of an employee with a certificate for the right to perform the function of the GIP (GAP) is proposed to be included in the list of minimum requirements for the issuance by a self-regulatory organization of a certificate of admission to work on organizing the preparation of project documentation.

none"> In this regard, the following should be noted.

none"> 1.1. At present, a number of mechanisms provided for by the Town Planning Code of the Russian Federation (hereinafter referred to as the Code) are aimed at achieving the goals of the bill:

none"> - most types of work on the preparation of project documentation can only be performed by entrepreneurs who have certificates of admission to such types of work issued by a self-regulatory organization (hereinafter also referred to as SRO) (part 4 of article 48 of the Code), which provides for them a number of costly obligations, regular recertification of employees and control by SROs (Articles 55.4, 55.5, 55.13 of the Code) According to the calculations of the Ministry of Economic Development of Russia, the average expenses of design organizations in the first year of joining SROs are about 513,000 rubles, in subsequent years - about 145,000 rubles;

none"> - design documentation for most types of capital construction objects is subject to mandatory examination (Part 1 of Article 49 of the Code) and can only be approved in case of a positive conclusion of such an examination (Part 15 of Article 48);

none"> - insurance of civil liability of designers, which may occur in case of damage due to shortcomings in work that affect the safety of capital construction projects, has also become widespread, which, according to current legislation, allows to reduce the contribution to the SRO compensation fund by more than 3 times ( article 55.4 of the Code);

none"> - for the stages of engineering surveys and construction itself, the current legislation also provides for a number of permitting and supervisory procedures: mandatory receipt of a certificate of admission to work from the SRO of the relevant profile, mandatory examination of the results of engineering surveys, issuance of a construction permit, state construction supervision, issuance of a permit for putting the object into operation; civil liability insurance of the relevant legal entities(individual entrepreneurs).

none"> The requirements mentioned above, as well as those established by the authorities of the constituent entities of the Russian Federation and municipalities lead to the fact that in order to implement a construction project, for example, an apartment building, the developer needs to go through an average of 101 administrative procedures that are not related to the construction work, spending about 924 days
and 25 million rubles

Which is extremely burdensome for the economy.

none"> Given the above, the consolidation of an additional licensing procedure, which provides for mandatory certification of a significant number of employees of functioning design organizations, will ultimately lead to additional construction costs.

none">1.2. At the same time, the Code defines the procedure for compensation for damage caused due to shortcomings in the preparation of project documentation. Thus, according to Article 60 of the Code, compensation for damage caused as a result of shortcomings in the preparation of project documentation is carried out by the person who performed such work.

none">SRO bears subsidiary responsibility for causing the specified harm within the limits of the compensation fund.

none">In addition, the Russian Federation, a constituent entity of the Russian Federation or an organization that issued a positive conclusion from a non-state examination of project documentation bears subsidiary liability for causing harm.

none"> It should be noted that the Federal Law of November 28, 2011 No. 337-FZ "On Amendments to the Town Planning Code of the Russian Federation and Certain Legislative Acts of the Russian Federation" (hereinafter referred to as the Law
337-FZ), a number of changes were made to the Code aimed at improving the system of responsibility of subjects construction activities.

none"> In particular, from July 1, 2013, these subjects, as well as the Russian Federation (subjects of the Russian Federation) will bear joint and several
and not subsidiary liability for causing harm due to deficiencies in engineering surveys, preparation of project documentation, construction, reconstruction, overhaul capital construction projects.

none">In this case, the main responsibility will be concentrated on the owner of the object, the concessionaire or the developer (depending on the stage life cycle object and contractual obligations), which, according to Law No. 337-FZ
on an unconditional basis, compensate for the damage caused, and subsequently have the right to claim back (recourse) in the amount of compensation for damage and payment of compensation in excess of compensation for damage to the named parties to the construction process.

none"> On the basis of the foregoing, it seems that at present the system of permitting and control and supervisory procedures, as well as ensuring the responsibility of construction activity entities, is quite complicated and burdensome for entrepreneurs. The creation of additional conditions for the safety of capital construction facilities, obviously, should be achieved by improving this system, and not fixing an additional form of admission (attestation) and imposing additional responsibility on the design participants.

none"> 2. The proposed assignment of full responsibility for the organization of design work to the GUI (GAP) assumes that the relevant specialist is competent enough to analyze in detail all sections of the project documentation.

none"> At the same time, as consultations with representatives of the expert and business communities have shown, in reality, such a level of competence is impossible. In practice, the GUI (GA) acts rather than as a person who is competent in all areas of design and is able to control the work of developers of all sections of project documentation , but as a project manager, a representative of the design team.

none"> 3. As mentioned above, the presence at the main place of work of an employee who has a certificate for the right to perform the function of the GIP (GAP) is proposed to be included in the list of minimum requirements for the issuance of a certificate of admission by a self-regulatory organization to work on organizing the preparation of project documentation.

none"> It should be noted that Article 55.10 of the Code requires the development of requirements for the issuance of certificates of admission to work that affect the safety of capital construction facilities (including the legally established minimum necessary requirements) is referred to the exclusive competence of the general meeting of members of the self-regulatory organization.

none">Thus, in order to fulfill the requirements of the bill, it will be necessary to hold a general meeting of members of all self-regulatory organizations based on the membership of persons involved in the preparation of project documentation (169 SROs, uniting about 32,000 design organizations).

none">Estimation of the costs of these activities can be carried out using the following data.

none"> On December 30, 2009, the order of the Ministry of Regional Development of Russia dated December 30, 2009 No. 624 was issued "On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on the construction, reconstruction, overhaul of capital construction projects that have an impact on the safety of capital construction objects" (hereinafter respectively - Order No. 624, List hazardous work), which canceled the order of the Ministry of Regional Development of Russia dated December 9, 2008 No. 274, which approved the previous version of the List of Hazardous Works.

none"> The publication of Order No. 624 required the SRO of the construction complex to hold general meetings of members and replace the issued certificates of admission to work that affect the safety of capital construction projects.

none"> It can be assumed that the costs caused by the adoption of the bill associated with holding general meetings of members of the "project" SROs will be:

none">(150,000 rubles * 169) + (15,000 rubles * 32,000 * 2

) = 985,350,000 rubles, which, taking into account inflation in 2011 (6.1%) and forecasted in 2012 (6%), will be about
1,108,180,000 rubles.

none"> Taking into account the above remarks regarding the concept of the draft law, these costs should be recognized as unreasonable.

none">There are a number of other comments on the bill.

none"> 4. According to the draft article 3.1 of the Federal Law of November 17, 1995 No. 169-FZ "On Architectural Activities in the Russian Federation" (hereinafter referred to as the Law on Architectural Activities), the GUI (GAP) ensure and are responsible for the compliance of the developed project documentation and the developer's design assignment, the results of engineering surveys, the town-planning plan of the land plot, the requirements of technical regulations and other documents.

none">According to the explanatory note to the bill, the GIP (GAP) should bear administrative and criminal liability.

none"> At the same time, the draft law does not contain any provisions specifying the responsibility of the GIP (GAP), and does not provide for amendments to the Criminal Code of the Russian Federation and the Code of the Russian Federation on Administrative Offenses.

none"> At the same time, according to the Ministry of Economic Development of Russia, efficient system responsibility should be based primarily on mechanisms of an economic nature.

none"> 5. The bill provides for the need for each design organization to have a certified GIP (GAP) in order to obtain a certificate of admission to the SRO (that is, in fact, to obtain the right to engage in design).

none"> At the same time, the certification procedure, including the procedure and grounds for depriving a certificate and the procedure for maintaining a register of persons certified for the right to perform the functions of the CIP (CAP), is proposed to be established in the future by a departmental act of the authorized authority.

none"> In this regard, it is unacceptable, provided for in Article 3 of the draft law, that it enters into force from the day of its official publication: in this case, all design organizations in the country will lose the right to fulfill the relevant orders until the necessary by-laws are developed and adopted, certifications are carried out .

none"> Moreover, as the experience of the establishment in 2012 of the institute of non-state examination of project documentation and engineering survey results, the results of which were equated to the results of the state examination, the corresponding transition period should be at least 1 year.

none"> 6. The draft law also requires bringing it into line with the current legislation: at present, the examination of project documentation and engineering survey results for most facilities can be both state and non-state, although the draft law provides for only the first (draft paragraph 8 of Article 3 of the Law on at the same time, it should be clarified whether the appointment of a CIP (GAP) is supposed to work on objects, the design documentation for which is subject exclusively to state expertise, since the explanatory note does not say about limiting the scope of the CIP (GAP) to such objects.

none">Instead of the term "customer" used in the draft law, the Code uses the term "technical customer".

none"> 7. It seems necessary to more clearly define the areas of activity of the GIP and GAP: based on the drafted article 3.1 of the Law on Architectural Activity, the GIP can organize the design of any objects, while the GAP can organize the design of non-industrial objects.

none">8. The bill does not fully comply with the explanatory note.

none"> So, the explanatory note says about the need to involve the GIP (GAP) in the supervision of construction, but the bill does not contain such norms.

none">9. According to cover letter Ministry of Regional Development of Russia, the draft law was developed in accordance with paragraph 23 of the Plan of Legislative Activity of the Government of the Russian Federation, approved by the Decree of the Government of the Russian Federation of December 28, 2011 No. 2425-r (hereinafter referred to as the Plan).

none">At the same time, the development of the draft law is not provided for by the Plan: clause 23 of the Plan provides for the preparation by the Ministry of Regional Development of Russia of a draft federal law "On Amendments to the Federal Law" On Architectural Activities in the Russian Federation "and certain legislative acts of the Russian Federation (in terms of bringing legislative acts Russian Federation in accordance with the Town Planning Code of the Russian Federation).

none"> Based on the foregoing, it must be concluded that the draft law contains provisions that contribute to the emergence of unreasonable expenses of business and other activities, as well as provisions that impose excessive administrative restrictions on business and other activities.

none">As part of the regulatory impact assessment, public consultations were held with representatives of the business community and authorities state power a number of subjects of the Russian Federation.

APPROVE:
CEO
________________________
/_______________/
"____" ____________ 201_

1. General Provisions
1.1. The chief project engineer belongs to the category of managers.
1.2. The chief engineer of the project is appointed to a position on a competitive basis in order to organize the development of design estimates, tender and other documentation necessary for the construction and management of design and survey work, throughout the entire period of preliminary feasibility studies and investment calculations, bidding, conclusion of a contract with the customer, design, construction, commissioning of the facility and development of design capacities. The decision on appointment to the position of the chief engineer of the project and on dismissal is made by the General Director of the Company.
1.3. The Chief Project Engineer reports directly to the General Director of the Company.
1.4. During the absence of the chief engineer of the project (vacation, illness, etc.), his duties are performed by a person appointed by order CEO which acquires the relevant rights and bears responsibility for the improper performance of the duties assigned to it.
1.5. The chief engineer of the project in his activities is guided by: current legislation, regulatory materials for the design, construction and operation of facilities; The Charter of the enterprise, local regulatory legal acts, regulatory and administrative documents issued by the head of the organization; this job description, as well as other local regulations.
1.6. A person with a higher professional education, five years of project management experience, and at least eight years of design experience is appointed to the position of chief project engineer.
1.7. The Chief Project Engineer must know:
- legislative acts, regulatory legal and administrative documents, international and state standards, specifications and other materials for the development and execution of design estimates and other technical documentation, catalogs of project documentation for mass use, technical regulations, building codes and rules, regulatory documents of state supervision, other regulatory materials in relation to the specialization of the position;
- perspectives of technical, economic and social development industries;
- economics and organization of construction, labor and management;
- Fundamentals of copyright and patent science;
- protection requirements environment and environmental safety;
- fundamentals of labor legislation, rules and norms of labor protection, safety measures, industrial sanitation and fire protection;
- innovate experience design and construction;
- organization, planning, economics of design and engineering surveys;
- design methods;
- modern technical means of designing and performing computational work;
- means of automation of design work;
- certification procedure;
- profile, specialization and features of the structure of the enterprise;
- market methods management and enterprise management, its business plan;
- technical, economic, environmental and social requirements for the designed facilities;
- the procedure for concluding and executing economic and financial contracts, contracts for the creation (transfer) of scientific and technical products;
- local regulations related to project activities.
1.8. To perform the functions and exercise the rights provided for by this job description, the chief engineer of the project interacts:
- with the General Director of the Company or his substitute official on issues of obtaining orders, instructions, orders related directly to its activities; as well as providing all the necessary information on the cash flow in the cash desk of the Company;
- with the chief accountant and his deputy(s) on the following issues: obtaining the necessary accounting and tax reporting;
- with the head of the personnel department on the issues of obtaining personnel documentation;
- with employees who are part of the project team, on the issues of maintaining a specific project, monitoring its implementation;
- with other employees on the issues of obtaining all necessary, duly executed documents for the implementation of operations to maintain their project.

2. Job responsibilities
2.1. Chief Project Engineer:
- Prepares and approves the task for the performance of engineering surveys, the task for the preparation of project documentation for the capital construction object;
- Determines the criteria for the selection of participants in the work on the implementation of engineering surveys, the preparation of project documentation and the selection of performers of such work, as well as for the coordination of the activities of the performers of such work;
- Approves the results of engineering surveys, project documentation;
- Represents, coordinates and accepts the results of work on the implementation of engineering surveys, preparation of project documentation;
- ensures the planning of the enterprise's activities on issues within its competence;
- organizes the preparation of a calendar plan for the development of design and other documentation for construction, calendar plans release of scientific and technical products;
- participates in the development and scheduling of research, design, design and technological work for facilities that will use new technological processes and equipment with a long cycle of development, design and manufacture;
- controls the timing of the development of design and estimate documentation, the timing of the design and survey work;
- monitors the compliance of the technical and economic levels of the adopted design solutions with the established requirements, the economical use of funds for design and survey work, the timeliness of the development of design estimates;
- coordinates design and survey work for the entire complex of the project;
- controls the timeliness of placing orders for the supply of equipment and materials, organizing their acceptance, filing, if necessary, claims against manufacturers and suppliers;
- organizes monitoring of the progress of work on the implementation of the project;
- organizes work on checking for patent cleanliness of technological processes, equipment, structures, materials and products first applied or developed on the project;
- analyzes and systematizes the experience of design, construction and operation of the constructed facilities, prepares on this basis proposals for improving the technical level and economic efficiency design solutions;
- takes the necessary measures to ensure the required dynamics of investments and receipt of income from the implementation of the project, sufficient to compensate investors for the resources they have invested and the risk they have taken;
- ensures compliance with the norms and standards for the design, construction and operation of facilities, other individual requirements the customer to the technological level and quality, architectural expressiveness and social significance of objects;
- ensures the practical application of advanced scientific and technological achievements and the introduction of advanced technologies that ensure the competitiveness of the enterprise in the domestic (world) market;
- exercises control over the activities of subcontractors in the part related to the conduct of its project;
- participates in tenders (tenders) held by the customer when placing an order for the design of facilities.
2.2. Prepares data for concluding a contract with a customer for design and survey work and the provision of engineering and consulting services, including the stages of development, the composition and volume of documentation for construction, the conditions for insuring risks associated with the development of the project and its implementation, justification contract prices, copyright protection and intellectual property, privacy policy.
2.3. If necessary, participates in determining the composition of project participants, including subcontracting design and survey organizations, distributing tasks between them, concluding agreements on the scope of work, terms of their implementation and payment terms.
2.4. Provides a high technical and economic level of designed facilities based on the use of the latest achievements of science and technology, the most appropriate and cost-effective design solutions.
2.5. Ensures compliance of the developed design and estimate documentation with urban planning and other norms, state standards, rules and instructions.
2.6. Ensures the development of the most appropriate and economical design solutions.
2.7. Ensures that projects comply with the design specifications and working documentation.
2.8. Participates in the selection and approval of the location of the object, in the preparation of the design assignment and, if necessary, in the organization of engineering surveys.
2.9. Carries out technical management of design and survey work in the design of an object and field supervision of its construction, commissioning and development of design capacities.
2.10. Takes measures aimed at improving the quality of design and estimate documentation and reducing the consumption of material resources during the construction of facilities, reducing the cost of their operation based on improving the quality of design, urban planning and architectural and planning solutions.
2.11. He defends the project in the examination bodies, carries out the necessary approvals with state authorities and local governments.
2.12. Participates in the work of commissions for the selection of sites (roads) for construction, in the preparation of design assignments and in the organization of engineering studies for the development of design estimates and other technical documentation, organizes its development.
2.13. Forms tasks for subcontractors to perform the work assigned to them and provides these organizations with the necessary initial data, resolves issues that arise in the process of developing documentation.
2.14. Taking into account the actual state of construction or in connection with the introduction of new regulatory documents, prepares motivated proposals for the customer on making changes to the working documentation.
2.15. Provides timely resolution of issues related to the design and arising in the process of construction, commissioning of the facility and development of design capacities.
2.16. Organizes work to eliminate the detected defects in design estimates and other technical documentation, as well as to account for the expenditure of approved estimates.
2.17. Carries out the necessary approvals with state oversight bodies and other organizations for reasonable deviations from existing norms, rules, instructions.
2.18. Prepares reviews and opinions on rationalization proposals and inventions, draft standards, specifications and other regulatory documents related to design and construction.
2.19. He takes part in the examination of projects, preparation of publications and drafting of applications for inventions, attends seminars, practical conferences in his specialty.

3. Rights
The Chief Project Engineer has the right to:
3.1. Receive assistance from the General Director of the Company and his immediate supervisors in the performance of his official duties.
3.2. Introduce design organization in institutions, organizations and enterprises on the development, approval and review of design and other documentation for the construction, manufacture and supply of equipment and materials, construction and development of design capacities.
3.3. Make decisions and conduct correspondence under his signature on issues of technical and economic assessments and calculations of investments, bidding, conclusion of an agreement with a customer, design, construction, commissioning of an object and development of design capacities.
3.4. Negotiate and conclude preliminary agreements with the customer upon receipt of an order for the design and construction of an object, including the contract price and other conditions for the performance of work.
3.5. Form the composition of the participants in the development of the project, including from specialists who are not part of the organization's staff, determine their powers, forms of organization and remuneration, incentives and penalties.
3.6. Check the status of project development, including with the involvement of competent specialists and organizations as experts and consultants, compliance with the established design deadlines and the quality of design solutions in the process of developing project documentation.
3.7. Decide on the formation of a reserve of funds and its use.
3.8. Conduct additional inspection or testing of structures, conduct quality control of any part of the structure.
3.9. Suspend the performance of construction and installation works in case of their implementation with deviations from the project, in case of violation of the technical conditions and rules for the production of these works, as well as in case of their unsatisfactory quality.
3.10. Prohibit the use of any materials and equipment that do not meet the established requirements.
3.11. Suspend the fulfillment of contractual obligations if it becomes necessary to additionally agree with the customer on the implementation or acceptance of construction and installation works with deviations from terms of reference for the execution of the project.

4. Responsibility
The Chief Project Engineer is responsible for:
4.1. For improper performance or non-performance of their official duties provided for by this job description.
4.2. For causing material damage to the employer - within the limits established by the labor legislation of the Russian Federation.
4.3. For offenses committed in the course of their activities, within the limits established by the administrative, civil, criminal legislation of the Russian Federation.
4.4. For violation of information confidentiality regimes, failure to ensure the systematization and safety of documents, access to which he receives in the course of the implementation of the tasks assigned to him job duties, in the manner and on the terms established by the legislation of the Russian Federation.
4.5. For violation of the requirements of the Company's internal labor regulations, fire safety and safety regulations, the Rules for working with documents constituting a commercial secret, in the manner and under the conditions established by the legislation of the Russian Federation.