Complete set of project documentation. Composition of project documentation for examination. Accompanying the state examination of construction documentation

  • 03.04.2020
Placement of the order is carried out by a specialized organization
Mailing address
The actual address Russian Federation, 620014, Sverdlovsk region, Yekaterinburg, Malysheva st., 22
Telephone 7-343-3571590
Fax 7-343-3571195
Email [email protected]
The contact person Kostenko Irina Yakovlevna

Subject of contract

Subject of contract Development of design estimates for the manufacture of a transport checkpoint.
Initial (maximum) contract price RUB 349,980.00
Quantity of goods, scope of works or services Works on the development of design and estimate documentation for the manufacture of a transport checkpoint at the facility of the "Customer" conv. one
OKDP
Place of supply of goods, performance of work or provision of services Place of work performed: UBHR FKU "UOUMTS of the Ministry of Internal Affairs of Russia", Yekaterinburg, st. Elizavetinskoe highway, 48 A.
The term for the delivery of goods, performance of work or provision of services Terms (periods) of work performed: within 15 calendar days from the date of conclusion of the State contract.
Customer federal state institution "Ural District Department of Logistics of the Ministry of Internal Affairs of the Russian Federation"

Related documentation

  • . development of design and estimate documentation for the manufacture of a transport checkpoint estimate, development of design and estimate documentation for the manufacture of a transport checkpoint estimate.rar
  • . notice, notice.doc
  • . draft government contract, draft state contract.doc
  • . Kotir. request, Kotir. application.doc
  • More than 730 residents began to work in the capital's polyclinics

    More than 730 residents have started working in Moscow polyclinics. This was told by the Deputy Mayor of Moscow for social development Anastasia Rakova on Friday, April 3. Young professionals are recruiting medical institutions and also make home visits to patients.

  • In Moscow explained the rules of isolation

    Moscow Mayor Sergei Sobyanin said that they would not introduce passes for moving around the city yet, but it all depends on the development of the situation and how the residents of the capital will observe the self-isolation regime.

Similar lots

    Department of urban planning, communal and road management of the administration municipality"Krasnoyarsk region"

    State treasury institution "Management highways Republic of Tyva"

  • “1.1. The municipal customer instructs, and the Contractor assumes the obligation to fulfill design work, namely the correction project documentation on the object "Modernization of the boiler room No. 5 on the street. Communal 8-B / 1 in Ussuriysk", which passed the state examination (registration number 25-1-5-0147-11 dated 19.10.2011), in accordance with the assignment (Appendix No. 1) within the time limits stipulated calendar plan works (Appendix No. 2) (hereinafter referred to as works). 1.2. The municipal customer accepts the result of the work and pays the price stipulated by the contract.”

    Administration of the Ussuriysk City District

  • Municipal Preschool educational institution "Kindergarten"Firefly" p. Rybushka, Saratov District, Saratov Region"

    Administration of the municipal district Pokhvistnevsky of the Samara region

    Municipal state institution "Management capital construction urban district "Ohinsky"

Requirements for the composition and content of sections of project documentation in the course of construction, reconstruction and overhaul of capital construction projects are determined by law.The main document governing this is

« Composition and requirements for the content of sections of project documentation applied to various types capital construction facilities, including linear facilities, the composition and requirements for the content of sections of project documentation in relation to individual stages of construction, reconstruction of capital construction facilities, the composition and requirements for the content of sections of project documentation during overhaul capital construction projects, as well as the composition and requirements for the content of sections of project documentation submitted for state examination of project documentation and to state construction supervision bodies, are established by the Government of the Russian Federation.()

working documentation is developed in order to implement architectural, technical and technological solutions in the construction process.

The regulation does not contain instructions on the sequence of development of working documentation, which determines the possibility of its implementation, both simultaneously with the preparation of project documentation, and after its preparation. At the same time, the volume the composition and content of the working documentation should be determined by the customer (developer) depending on the degree of detail of the solutions contained in the design documentation, and indicated in the design assignment. (see Letter dated June 22, 2009 N 19088-SK / 08 Ministry of Regional Development of Russia)

The final set of design and estimate documentation, as a rule, includes design and working documentation ( Note. This is one of the main differences from the "P" and "RP" design stages, when only the documentation of the "RP" stage goes into the final project.). These types of documentation complement each other:

  • The project documentation includes the main sections on the organization of construction("Explanatory note", "Construction organization project", "Measures to ensure fire safety"," Estimate for the construction of capital construction facilities ", etc.).
  • Working documentation contains working drawings, documents, specifications and is the basis for the implementation of the decisions taken in the project.

Project documentation

Reference

The list of design documentation is usually given in the section "Composition of design documentation" (section code - "SP"). This section is most often found in Volume 0.

If necessary, at the initiative of the customer, project documentation is developed in relation to individual stages of construction, reconstruction of facilities. (cm. ). This is indicated in the design assignment.

Design documentation for individual stages of construction is developed in the volumes necessary for the implementation of each stage of construction. It must meet the requirements for the composition and content of sections of project documentation established by the Regulations for capital construction projects.

Reference:

Under construction phase refers to the construction of one of the capital construction facilities, the construction of which is planned to be carried out on one land plot if such an object can be put into operation and operated autonomously, that is, regardless of the construction of other capital construction facilities on this land plot, as well as the construction of a part of the capital construction facility that can be put into operation and operated autonomously, that is, regardless of construction other parts of this capital construction object.

Cost calculation

List of sections of design documentation for capital construction facilities for industrial and non-industrial purposes

(houses, warehouses, administrative buildings, shopping centers, business centers, etc.)

GPU

Lease contract

Cadastral plan

land contract

Specifications

SRO designers

Project documentation

1. Explanatory note

2. Scheme of the planning organization of the land plot

3.Architectural solutions

4.Constructive and space-planning solutions

5. Information about engineering equipment, engineering and technical support networks, a list of engineering and technical measures, the content of technological solutions

5.1. Power supply system

5.2. Water supply system

5.3. Drainage system

5.4. Heating, ventilation and air conditioning, heating networks

5.5. Communication networks

5.6. Gas supply system

5.7. Technological solutions

6. Construction organization project

7. Project for the organization of work on the demolition or dismantling of capital construction objects "(performed if necessary, demolition (dismantling) of an object or part of a capital construction object)

8.List of measures for environmental protection

9. Measures to ensure fire safety

10.Measures to ensure access for persons with disabilities

10(1). Measures to ensure compliance with the requirements of energy efficiency and the requirements for equipping buildings, structures and structures with metering devices for the energy resources used

11. Estimate for the construction of capital construction projects

12. Other documentation in cases provided for by federal laws

12.1. Safe operation of buildings and structures

12.2. civil defense and emergency situations

12.3. Anti-terrorist measures

12.4. Traffic management

Geotechnical

Engineering and geodetic

Engineering and environmental

List of design documentation sections for linear capital construction projects

(gas pipelines, water pressure units, electricity networks, etc.)

Initial permit documentation

GPU

Lease contract

Cadastral plan

land contract

Specifications

SRO designers

Project documentation

1. Explanatory note

2. Project of the right of way

3. Technological and constructive solutions of a linear object. Artificial constructions

4. Buildings, structures and structures included in the infrastructure of a linear facility

5. Construction organization project

6. Project for the organization of work on the demolition (dismantling) of a linear facility

7.Measures for environmental protection

8. Measures to ensure fire safety

9. Estimate for construction

10. Other documentation in cases stipulated by federal laws


Documents based on the results of engineering surveys

Geotechnical

Engineering and geodetic

Engineering and environmental

Cost calculation